The 12 October presentation identified the site opposite the French Furze entrance and an indicative 30–35 homes. These questions seek the written evidence supporting the proposal, the sewerage-capacity statements and the proposed arrangements for company responsibility. The aim is to make the relevant information available for residents to assess.
Following the parish meeting · 12 October 2026
From an early presentation to checkable answers
Acorn attended voluntarily before formal pre-application discussions, according to the meeting account. Its drawings are provisional. Nick reports that Jack offered to receive further questions through the parish clerk. These proposed follow-up questions have not been submitted by this website.
The existing French Furze remedy remains the subject of quarterly Vistry and resident meetings. Nick’s account of its scope, pending section 73 approval and best-case June 2027 timing is background, not proof that Acorn’s proposed site would use or depend on it. Read the attributed account and its limits.
Read the meeting account and view the photographed plans. The account is based on Nick Lawton’s meeting notes, with photographs of the displayed plans. It is not approved council minutes. Oral statements about future safeguards are not completed agreements.
The proposal
Will you publish the drawings and identify the responsible companies?
Please supply the original location drawing and concept layout shown on 12 October for the field opposite French Furze’s entrance, including all land needed for access and drainage. Identify the legal landowner, intended applicant and delivery company, with company numbers. Confirm the indicative 30–35-home mix, including the proposed two- to four-bedroom homes and possible bungalows, and explain which details remain open.
The proposal presented on 12 OctoberThe proposal
What is the formal status and consultation timetable?
The 12 October presentation was described as preceding any formal pre-application discussion. When will that process begin, what further community engagement is planned, and when will an application be submitted? Please provide references when available. The planning authority should confirm the applicable decision process and how residents can make representations; the meeting discussion does not establish how a future application will be decided.
Public consultation guidanceWater and drainage
Which drainage systems would serve the proposed site?
Please map the site's catchments, foul-water route, surface-water routes, every connection and outfall, and any shared downstream assets. Establish whether it would use French Furze infrastructure or interact with Vistry’s remedy; neither connection nor dependency has been verified. Separate foul sewage, runoff from new roofs and roads, and existing farmland runoff. Compare the relevant receiving systems without and with the proposal and other committed growth.
The identified site and its unconfirmed drainage connectionsWater and drainage
Would the proposal depend on Vistry’s remedy?
If the proposal relies on Vistry’s remedy or shared infrastructure, identify the dependency and assess construction and occupation while that remedy is reported to be awaiting approval, or if it is delayed or unfinished. If no such dependency exists, explain the drainage arrangements and evidence supporting that conclusion. The planning authority should identify how any necessary infrastructure and capacity would be verified before additional loads are introduced.
French Furze’s remedy: background account, not an established dependencyWater and drainage
Will South West Water confirm the constraint, upgrade and timetable?
Please provide South West Water’s written assessment of the capacity constraint described at the meeting, the affected assets and the upgrade required for this proposal. Confirm the programme, funding and capacity after other committed growth. Put the statement of no occupation before the necessary upgrade in writing, identify who will verify completion and capacity, and explain how that restriction and any construction-stage safeguards would be secured.
Acorn’s oral account of capacity and occupationWater and drainage
How does the design handle heavy rain and overland runoff?
Please publish the topographic and catchment surveys, ground investigations, infiltration and groundwater evidence, design rainfall and climate allowances. Show where water travels if the system exceeds its design capacity and identify the properties and watercourses that could be affected. Any runoff from higher ground should be assessed where the surveyed levels show it is relevant.
Devon sustainable drainage guidanceWater and drainage
How have previous flood incidents informed the assessment?
Please explain which dated flood accounts, rainfall records and site inspections are relevant to the proposal’s catchments and receiving networks. Distinguish surface-water flooding from sewer surcharge, and show how the proposal avoids increasing risk to existing homes and any downstream communities.
Devon’s investigation of the October 2021 floodsWater and drainage
Who will maintain drainage serving the new homes?
For Acorn’s proposed drainage and any shared infrastructure it would rely on, please name the responsible bodies, adoption arrangements, inspection schedule and funding mechanism. Explain who will respond to a failure during construction, before adoption and over the new development’s lifetime.
National sustainable drainage standardsRoads and access
What do current traffic and safety surveys show?
Please assess the indicative entrance opposite French Furze, including visibility, crossing movements and interaction between the two entrances. Identify expected approach routes and provide recent vehicle counts, speed and collision evidence, road widths and junction assessments. Compare conditions without and with the new homes, including school periods, pedestrians, cycles, deliveries and other committed development.
Local transport policy DEV29Roads and access
Can residents safely make the whole journey to and from the bus?
Please identify the actual stops and current services Acorn’s transport assessment relies on, distinguishing Forces Cross from Woodlands Leisure Park. Assess both the outward and return walking routes from the proposed homes: distance, gradients, footway gaps, bends, passing space, A3122 crossings and waiting areas. Show how children, older people and people with limited mobility would use those routes, including after dark, and how any necessary improvements would be secured.
Why stop locations alone do not establish safe bus accessRoads and access
How would construction traffic be managed?
Please show Acorn’s proposed construction route, delivery hours, vehicle sizes, passing and turning arrangements, wheel cleaning and a contact for problems. Assess the effect on the school, pedestrians and other road users where routes would interact, including any overlap in routes and timing with French Furze remedial works.
The original permission’s construction-management conditionResponsibility and delivery
What guarantees are proposed, and who would provide them?
At the meeting, parent-company guarantees were described as usual practice, but no guarantor was named. Please identify any proposed guarantor and company number, the obligations covered, beneficiaries, duration, limits and enforcement arrangements. Will there be a bond or protected funding for unfinished drainage, highways and planning obligations? Explain the protection during construction and after sale or insolvency. Please also provide the written follow-up requested about RST Constantine Bay Homes’ liquidation and Bonvilston Vale’s administration, including their later outcomes.
What Acorn said, and what remains unconfirmedNeighbours and delivery
How will the design protect neighbouring homes?
For the field identified in the presentation, please provide scaled sections through the site and neighbouring properties, showing ground levels, floor and ridge heights, windows and boundaries. Use them to assess privacy, outlook, daylight, sunlight, lighting and noise. The concept drawing does not establish these effects; surveyed levels and detailed design are needed.
Local health and amenity policy DEV1Neighbours and delivery
How would commitments be secured and checked?
Acorn and the planning authority should identify the drawing, condition or legal agreement that would secure each safeguard, who would verify delivery, and the trigger for doing the work. Please distinguish proposed parent guarantees, infrastructure bonds, home warranties and estate maintenance arrangements: which obligations would each cover? Publish the presentation, written answers and follow-up dates so residents can check the commitments.
Guidance on consultation before a planning decision
Common material planning matters
Describe the specific impact, its location and the evidence supporting it. Privacy, drainage, road safety and other relevant planning effects can be assessed against the proposal and policy. A change in property value is generally not a material planning consideration.
Read the planning matters guide →